By Federico Buccetti
Articles
Are We Asking the Wrong Question About Hydrogen Storage?Why choosing the right hydrogen storage solution is about more than finding the cheapest or most advanced technology.
When it comes to hydrogen storage, the same obvious questions tend to be asked. Which technology is the most efficient? Which is the cheapest? Which offers the greatest capacity?
But what if these are the wrong questions to begin with?
The previous article of this series modelled what it takes to supply an industrial customer with a constant 1,000 kg of green hydrogen every hour from British wind and solar power, using actual 2025 weather. The conclusion was that the hardest part is not making hydrogen, but bridging the hours and days when renewable output falls short. A fully renewable supply needed several days of the customer's demand in H₂ storage, and even then a significant share of the electricity it paid for was never used.
That result reframes the storage question. The useful question is not which technology is best in the abstract, but what kind of storage a given need calls for, what it costs when it is used the way that need requires, and where the conditions exist to deliver it. The research carried out by BIP with Imperial Business School developed a framework for answering those questions. This final article applies it to the same industrial case, compares three ways of storing a fully renewable supply, and shows where in the UK salt caverns make the difference.
The short answer: with access to a salt cavern, a fully renewable supply costs ~£1.2–1.4 less per kilogram, around 17–20% below the same supply with above-ground storage. About half of today's UK industrial hydrogen demand sits close to salt, and the natural business model is shared storage, supported by the cap-and-floor regime the government is developing.
Why bigger, cheaper or more advanced doesn't necessarily mean better
Hydrogen has a low energy density by volume, so storing meaningful quantities means either very large volumes or ways of packing more hydrogen into the same space. It can be compressed into steel or composite vessels, liquefied at −253°C, converted into chemical carriers such as ammonia or liquid organic hydrogen carriers (LOHC), or stored underground in salt caverns, lined rock caverns, depleted fields and aquifers.
The most important differences between these options are not technological. They concern how much hydrogen must be held, for how long, and how often it is cycled in and out. Figure 1 maps the main options against those two dimensions, together with the three cases analysed in this article.
Figure 1. Indicative operating envelopes of hydrogen storage technologies, with the storage chosen by the model in each case and real UK cavern sizes.
Above-ground compressed storage covers the left of the map: small volumes, cycled daily or several times a day. It is modular, can be placed almost anywhere and is the natural choice for buffering. Lined rock caverns sit in the middle; the HYBRIT fossil-free steel project in Sweden tested one at pilot scale, with results published in 2025. Salt caverns hold from a few hundred to several thousand tonnes each and can be filled and emptied many times a year. Depleted fields and aquifers offer the largest volumes and suit seasonal or strategic reserves, but are slower to cycle and raise purity questions. Ammonia and LOHC can serve any scale, and come into their own when hydrogen has to travel long distances, but conversion and reconversion consume a significant part of the energy stored.
How much storage a fully renewable supply needs depends on what storage costs. When it is expensive, the model buys less than a week of demand and compensates with more renewable capacity; when it is cheap, it holds around two weeks. That range spans the upper edge of above-ground storage and the lower end of the salt-cavern range. The historic hydrogen caverns at Teesside held ~250 tonnes each; a modern cavern, such as those planned in Cheshire, holds ~2,000 tonnes.
What do the numbers actually tell us?
Cost is central to any investment decision, but headline costs of storage are easily misread. Published estimates of the levelised cost of storage vary widely: for salt caverns, the studies reviewed in the BIP–Imperial research range from ~£0.3 to ~£2.1 per kilogram, while compressed storage at 700 bar is quoted at ~£1.2 per kilogram assuming 120 cycles a year (converted from euros). Most of that spread is not about the technology at all. It is about how often the storage is assumed to be used.
Storage capacity is paid for once, but the cost is recovered over every kilogram that passes through it. A store that is filled and emptied every day spreads its cost over 365 cycles a year; one that bridges multi-day lulls in wind and sun completes only five to fifteen. Figure 2 shows how strongly this drives the cost per kilogram withdrawn.
Figure 2. Capacity cost of hydrogen storage per kilogram withdrawn, as a function of full cycles per year, for the three storage options in the case study.
At ~£870 per kilogram of installed capacity, above-ground storage is affordable for daily buffering, at ~£0.3 per kilogram withdrawn. Used to bridge renewable lulls, clevelised times a year, the same storage costs ~£10 for every kilogram that comes out of it.
Salt caverns change the picture because their cost per kilogram of capacity is 20 to 35 times lower, and they last twice as long. Published engineering correlations put salt caverns at roughly £20–50 per kilogram of capacity depending on size, ~£45 for a 300 tonne cavern and ~£24 for a 1,200 tonne one, with a technical life of 50 years or more; costs in UK bedded salt could be higher than these correlations suggest. Even cycled only five times a year, a cavern delivers each kilogram for less than £1.
Not every option fits this use. Ammonia may carry higher storage costs but can be the right answer for international trade or where ammonia is the end product. LOHC may be relevant where liquid-fuel logistics and industrial waste heat already exist. Neither is a natural fit for balancing a domestic renewable supply, where every conversion step adds energy losses at exactly the moments the system is short of energy.
A case study: three ways to store a fully renewable supply
To see what this means for the cost of hydrogen, the analysis returns to the industrial case of the previous article: a customer using 1,000 kg of hydrogen every hour, ~8,800 tonnes a year, supplied entirely from renewable electricity matched hour by hour with British wind and solar output in 2025. The renewable power is bought through power purchase agreements, with the same mix of 1.5 MW of wind for every MW of solar in all cases, and delivered over the public grid. Output the plant cannot use is sold at the 2025 market price of the hour, never above the price paid for it. For each case, the model sizes the renewable contracts at that fixed mix, the electrolyser and the storage, and dispatches them hour by hour across the year.
Three configurations were compared:
• Case 1, on site with above-ground storage. Electrolyser and compressed H₂ storage at 350 bar next to the customer.
• Case 2, on site with a small salt cavern. The same 70 MW electrolyser, built where salt lies under the site, with one small dedicated cavern of 300 tonnes.
• Case 3, a cluster hub. Demand of 3.5 tonnes an hour, ~30,000 tonnes a year or three to four customers of this size, is supplied from a hub with a 300 MW electrolyser next to a 1,200 tonne salt cavern, with a 30 km pipeline to the users.
Electrolysers are costed for a plant built around 2030, reflecting both falling equipment costs and economies of scale: ~£1,400 per kW at 70 MW and ~£1,150 per kW at 300 MW. Figure 3 shows the resulting levelised cost of hydrogen (LCOH): the total annual cost of the system, including storage, divided by every kilogram delivered to the customer.
Figure 3. Levelised cost of hydrogen by component for the three configurations, with the capacities chosen by the model (real 2025 £).
Three results stand out.
• Above-ground storage forces an inefficient system. In Case 1 the model buys only ~105 tonnes, around four days of demand, because each tonne is so costly. To keep the supply fully renewable, it contracts ~400 MW of wind and solar for a 70 MW electrolyser and sells ~40% of that output back into the market, often below what it paid. Storage still adds ~£1.1 to every kilogram. The LCOH reaches ~£7.2 per kilogram. It is a configuration forced by expensive storage, not one a developer would choose freely.
• A small cavern cuts ~£1.2 per kilogram. With the same electrolyser, the plant now holds ~13 days of supply. Because the customer's demand is fixed, a larger store cannot use more electricity over the year; what it changes is how much renewable capacity must be contracted to cover every hour. Wind can be banked on windy days and drawn down through long lulls, so the plant needs a quarter less wind and solar capacity and sells ~20% of its output instead of ~40%. Storage costs fall to under £0.2 per kilogram, around seven times less than above ground, and electricity costs fall by a further ~£0.3. The LCOH drops to ~£6.0 per kilogram, worth ~£11 million a year to the customer.
• Pooling demand at a hub saves another ~£0.2. Most of the gain comes from lower electricity costs: with a larger cavern and electrolyser relative to demand, the hub sells less than 10% of its renewable output instead of ~20%. It also stores each kilogram for ~£0.1, more than ten times less than above ground. After paying for the 30 km pipeline, which adds ~£0.1 per kilogram, hydrogen reaches the customer at ~£5.8 per kilogram, ~£1.4 below Case 1. It is the cheap cavern that makes this configuration possible in the first place.
Looking ahead, the case for bulk storage becomes even stronger. As renewable capacity grows, the UK is expected to see many more hours of very low or negative prices, as markets with high shares of wind and solar already do. A plant backed by a salt cavern can follow those hours opportunistically, producing when power is cheapest and drawing on storage when it is expensive, while above-ground storage is too small to bridge long periods of high prices. Tested against a 2035 GB hourly price scenario, with electricity bought from a largely decarbonised grid, the same 1 tonne-per-hour supply backed by a cavern reaches an LCOH of roughly half the values shown above. Salt caverns, most plausibly developed as shared assets in a hub, are therefore not only the cheapest route to a fully renewable supply today, but also the configuration best placed to capture low-cost hours in future.
Where this applies in the UK
Salt caverns cannot be built anywhere. Figure 4 places current UK hydrogen demand, ~300,000 tonnes in 2025 (~10 TWh on a lower heating value basis), against the onshore salt basins. Around 75% is used in refineries and most of the rest in chemicals. Much of it is a refinery by-product today, but conversions to biorefineries or synthetic fuels would need far more hydrogen than refineries generate.
Figure 4. Estimated UK hydrogen demand in 2025 at refineries and chemical clusters, against onshore salt basins and hydrogen salt-cavern sites.
Three clusters have the geology to match the cases above:
• Teesside (Case 2): hydrogen was stored in salt caverns beneath the chemical sites for around 50 years from 1971. The geology is proven, but demand is uncertain after BP withdrew its two Teesside hydrogen projects in 2025.
• North West (Case 3): production is planned at Stanlow, ~28 km from Storengy's planned 19-cavern store at Holford (~2,000 tonnes per cavern), with a shared pipeline network across the region. Neither has yet reached a final investment decision.
• Humber: SSE and Equinor's planned Aldbrough storage (~320 GWh) lies 13–23 km from the Saltend chemicals park and the Humber refinery.
Elsewhere the case is weaker: Fawley is ~90 km from planned storage in Dorset, while Pembroke and Grangemouth are more than 200 km from usable salt. Overall, around half of remaining industrial demand lies within 30 km of salt. Distance matters less than it seems: a shared 30 km pipeline adds only ~£0.1 per kilogram, and a hub stays competitive up to ~80 km. The binding conditions are geology and enough demand around one site.
The storage decision is also a business model decision
The case study points to a commercial question that deserves as much attention as the technology: who should own and operate the storage, and how is its cost shared?
A single plant of this size needs a fraction of a modern cavern, and developing one takes years of drilling, leaching and testing. Shared caverns are therefore likely to work like natural gas storage today. Each user books capacity rather than owning the asset: space in the cavern, the right to inject and withdraw at a given rate, and a charge per kilogram moved to cover compression and gas treatment. In the hub case, a customer of this size would book just under a third of the cavern. A user pays for the capacity it books, whether or not it uses all of it, and capacity that nobody books is a risk for the operator.
Users therefore face a choice between three broad models. They can buy firm hydrogen under long-term contracts and leave storage to the supplier. They can integrate vertically, owning production and storage to control their supply. Or they can buy storage capacity as a service from a third-party or regulated operator, keeping control of their supply without carrying the full cost and risk of the asset. Integration can pay where the additional investment is justified by savings over time, but in storage the value comes mainly from access to cheap bulk capacity, not from owning it.
Policy is moving in the same direction. In its July 2025 update, the UK government reaffirmed its minded-to position of a revenue cap-and-floor for hydrogen storage awarded through competition, with first allocation rounds for storage and transport targeted for the first half of 2026, and more than £500 million committed to a first regional hydrogen transport and storage network expected from 2031. The floor protects the operator against the risk of unused capacity, which is precisely what makes shared storage viable before demand has fully materialised.
So, are we asking the wrong question?
The greatest opportunity may not lie in a breakthrough storage technology, but in matching the technologies already available to the right need, in the right place, under the right business model. Above-ground storage remains the right tool for buffering. For a fully renewable supply, a salt cavern can take ~£1.2–1.4 off every kilogram of hydrogen today, and as low-price hours become more frequent it could help roughly halve the cost. Users far from salt can look to shared pipelines, other sources of flexibility or a less demanding matching target.
The question should therefore no longer be 'Which hydrogen storage technology is best?', but: 'How many days does our supply need to bridge, and can we share access to salt?'
Download the full BIP UK and Imperial Business School research paper, Fuelling Sustainability and Savings: The Business Case for Green Hydrogen Storage, to explore the technologies, indicative costs and commercial considerations in greater detail.
Methodology note: hourly optimisation over 2025 Great Britain wind, solar and price data; 100% renewable electricity matched hourly; hydrogen on a lower heating value basis. Wind and solar PPAs at £72 and £65/MWh (1.5 : 1 capacity ratio) delivered through the grid, with surplus sold at hourly market prices up to the PPA price. Grid charges reflect energy-intensive industries relief (levy exemptions, 90% network charging compensation, Climate Change Levy exemption; eligibility of electrolysers not yet explicitly confirmed); without relief LCOH would be ~£11.2, ~£9.9 and ~£9.4/kg. Electrolyser £1,400/kW (70 MW) and £1,150/kW (300 MW) for a c.2030 build. Storage: above ground £870/kg at 350 bar; salt caverns £45/kg (300 t) and £24/kg (1,200 t). Pipeline £1m/km; hub storage at build cost rather than a third-party tariff. Real 2025 £, 8% WACC; asset lives of 50 years for caverns, 40 for pipelines and 25 for other assets. The 2035 scenario uses GB hourly prices from a European market simulation (three weather years, grid purchases instead of PPAs). UK demand from DESNZ (2026); refinery split is a BIP estimate.
Media enquiries
For additional quotes or comments, please contact our press office.
Debbie Schogger at BIP Group: debbie.schogger@bip-group.com
About BIP
BIP UK is a leading international management consulting firm focused on digital transformation, operational excellence, and innovative technology solutions.
The firm has a global team of approximately 6,500 professionals, with offices across the UK, Italy, Spain, Portugal, Brazil, Colombia, the United States and other international markets. By prioritising research and leveraging cutting-edge technology, BIP UK delivers innovative solutions across a wide range of industries, including Automotive & Mobility, Defence, Energy & Utilities, Financial Services, Life Sciences, Manufacturing, Property, Public Sector, Retail and Telecoms.